Iqbalgsm Worldwide delivery Trusted by 5,000+ technicians
Iqbal GSM

Suggestions

Products

Search for “” →
Shop All Part Request Wholesale Membership

Categories

2UUL TOOLS YF BATTERY CABLE JCID Maant LB PROGRAMMER PRODUCTS Octopus
Account
Hi1103 IC
Out of Stock

Hi1103 IC

4.0 (12 reviews)

As low as

Rs 0.00

Worldwide shipping · Cash on Delivery

Quantity
Unit price Rs
Quantity
Total Rs
Ask on WhatsApp
Seller: Iqbal GSM

Product Details

1. ARCHITECTURAL OVERVIEW & CIRCUIT SPECIFICATIONS

The HiSilicon Hi1103 is Huawei's flagship connectivity SoC designed to accompany Kirin 970, 980, and 990 mobile platforms:

- 160 MHz Channel Wi-Fi Architecture: Features an advanced analog front-end (AFE) with internal 2x2 MIMO transceivers, integrated power amplifiers (PAs), and low-noise amplifiers (LNAs) for both 2.4 GHz and 5 GHz frequency bands.

- Dual-Frequency GNSS Engine: Processes high-precision L1 (1575.42 MHz) and L5 (1176.45 MHz) carrier frequencies simultaneously, eliminating ionospheric refraction delays and multipath reflections in urban canyon environments.

- Reference Clock Circuit: Relies on an external 37.4 MHz or 38.4 MHz temperature-compensated crystal oscillator (TCXO). A defective crystal halts the internal PLL, causing immediate Wi-Fi/BT software freeze.

- Primary Operational Voltage Rails:

  * VDD33_WIFI / V_BATT: 3.3V high-current analog supply powering internal RF power amplifiers. Sourced via a high-current LDO within the main PMIC (Hi6421 / Hi6422).

  * VDD18_WIFI: 1.8V regulated digital I/O rail supplying serial transceivers, I2C/UART/PCIe interfaces, and internal analog bias networks.

  * VDD11 / VDD12: 1.1V - 1.2V core digital logic voltage driving the baseband DSP processor and cryptographic engines.

  * VDD_RTC: Low-power keep-alive power rail maintaining sleep-clock state machines.

2. HARDWARE DIAGNOSTICS & SYSTEM FAULT ISOLATION

Step 1: Software / MAC Address State Check

- Navigate to: Settings > About Phone > Status Information.

- Inspect "Wi-Fi MAC Address" and "Bluetooth Address":

  * If the MAC address displays "02:00:00:00:00:00", "Unavailable", or blank, the Kirin AP is failing to communicate with the Hi1103 via the PCIe/SDIO bus. This confirms a hardware defect (unpowered IC, missing 1.8V rail, severed clock line, or fractured BGA solder balls).

  * If the MAC address displays a valid hex string but Wi-Fi cannot scan networks, the baseband is alive but the external 2.4G/5G antenna switch, matching inductor, or internal LNA has failed.

Step 2: Passive Diode Mode Testing (Red probe on Ground, Black probe on test point):

- Locate the bank of SMD capacitors adjacent to the Hi1103 perimeter:

  * 3.3V RF Rail Capacitor: Expected normal diode drop ~0.450V - 0.550V. (0.000V indicates punctured internal PA or shorted filter cap).

  * 1.8V I/O Rail Capacitor: Expected normal diode drop ~0.420V - 0.500V.

  * 1.1V Core Rail Capacitor: Expected normal diode drop ~0.280V - 0.380V.

  * PCIe / SDIO Data Lines: Expected normal diode drop ~0.350V - 0.450V on all differential pairs.

  * Antenna Feed Contact: Verify continuity through the passive filter bank to the chassis antenna spring.

Step 3: Live Voltage & Clock Verification (Phone powered, Wi-Fi toggled):

- Check for 3.3V on the primary power input capacitor.

- Check for 1.8V on the I/O bus capacitor.

- Check the 37.4 MHz / 38.4 MHz reference clock with an oscilloscope or RF frequency counter.

3. REQUIRED TOOLS & REWORK MATERIALS

- Precision Hot Air Rework Station (Quick 861DW, Atten ST-862D, Sugon 8620DX) with 5.0 mm angled nozzle.

- Micro-soldering iron station (JBC C210 or T12) equipped with a fine knife (K) or curved needle tip.

- Stereo inspection microscope (20x - 45x magnification).

- Specialized ultra-thin curved underfill cleaning blade / micro-hook.

- Dedicated HiSilicon Hi1103 / GFCV110 direct-heat or magnetic BGA reballing stencil.

- Solder alloy: Sn63/Pb37 leaded solder wire (0.2 mm) and Sn63/Pb37 solder paste (183°C melting point).

- Consumables: Rosin-based tacky flux (Amtech NC-559-V2-TF), high-density copper desoldering wick (1.0 mm width), 99.9% pure Isopropyl Alcohol (IPA), high-temperature polyimide (Kapton) tape, aluminum foil heat shield.

4. STEP-BY-STEP UNDERFILL REMOVAL & REWORK PROTOCOL

Step 1: Board Securing and Thermal Shielding

- Fix the Huawei/Honor motherboard securely into an adjustable PCB repair fixture.

- CRITICAL SHIELDING: Huawei flagship boards feature Kirin 980/990 CPUs and high-density UFS NAND memory in close proximity to the Wi-Fi IC or directly on the reverse side of the board. Both are encapsulated with heat-sensitive black epoxy.

- Cover adjacent CPU, memory, and camera FPC connectors with two layers of Kapton tape, topped with an aluminum foil deflector or copper heat-sink coin.

Step 2: Perimeter Underfill Epoxy Removal

- Set the hot air station to 200°C - 220°C with 30 LPM airflow.

- Heat the perimeter edge of Hi1103 for 10-15 seconds to soften the tough factory black epoxy underfill.

- Using an ultra-fine curved underfill scraping knife held at a 45° angle, gently scrape away the underfill fillet around all four borders of the IC.

- Exercise extreme caution: do NOT dig into the motherboard substrate to avoid severing multi-layer PCB traces or knocking off adjacent 0201 bypass capacitors.

Step 3: Desoldering and IC Extraction

- Apply a generous bead of tacky flux around the borders of the chip.

- Increase hot air temperature to 335°C - 345°C with an airflow rate of 40-45 LPM.

- Hold the nozzle vertically (90°) at a distance of 1.5 cm, maintaining smooth, continuous circular motions around the perimeter of the chip for 25 to 35 seconds.

- Lightly test solder melt by touching an adjacent non-underfilled passive component.

- Once the solder balls liquefy, lift the IC vertically using fine curved tweezers. Never pry, wedge, or twist the IC before the underfill softens and solder liquefies to prevent tearing motherboard BGA pads.

Step 4: Footprint Dressing & Underfill Cleanup

- Keep the board slightly warm (~180°C - 200°C) and scrape away any residual underfill remaining inside the pad matrix using a flat-head micro-blade.

- Add fresh flux and sweep across the footprint using a soldering iron (set to 340°C) with leaded Sn63/Pb37 solder to mix and dissolve residual factory lead-free alloy (SAC305).

- Lay fine copper wick flat across the pads and glide the iron lightly across the braid without downward force to planarize all pads.

- Clean thoroughly with 99.9% IPA and an ESD foam swab. Inspect under the microscope for missing or torn pads.

- If any active signal pad has torn due to prior drop damage, scrape the underlying trace, run a 0.02 mm insulated copper jumper wire, form a micro-ring pad, apply UV green oil, and cure under a 365 nm UV lamp for 60 seconds.

Step 5: Reballing the Replacement Hi1103 IC

- Position the clean replacement Hi1103 chip into the matching BGA stencil under the microscope, ensuring aperture registration.

- Apply Sn63/Pb37 solder paste evenly across all apertures. Scrape flush with a clean razor blade and dry excess moisture with a lint-free cloth.

- Direct hot air at 280°C - 300°C with low airflow (15-20 LPM) until all paste apertures melt into uniform, bright 0.20 mm - 0.25 mm solder spheres.

- Allow the stencil to cool for 15 seconds, apply a drop of flux, reflow briefly for 2 seconds to round the balls, and release the IC.

Step 6: Alignment and Reflow Soldering

- Apply an ultra-thin, translucent film of tacky flux across the logic board footprint. Excess flux will cause this lightweight BGA chip to float and misalign during reflow.

- Align the Hi1103 over the footprint using the silkscreen boundary lines and the Pin 1 orientation index corner mark.

- Apply vertical hot air at 320°C - 330°C with 35 LPM airflow.

- When the solder reaches 183°C, the chip will sink downward and self-align onto the pads via liquid solder surface tension.

- Execute the "tweezer tap" test: gently tap the corner of the chip body with tweezers; it must instantly bounce back into center alignment.

- Remove heat vertically and keep the board stationary.

Step 7: Post-Rework Verification & Testing

- Allow natural ambient cooling for 3 minutes. Never apply rapid cold air or freeze spray, as sudden contraction can rupture internal silicon interconnects.

- Clean all flux residue with 99.9% IPA.

- Measure diode mode values across primary power capacitors (3.3V, 1.8V, 1.1V) to ensure zero inter-ball shorts exist.

- Install the logic board into the frame, connect the antenna cables, and power on the phone.

- Verify in Settings that the Wi-Fi MAC Address and Bluetooth Address appear correctly.

- Test dual-band Wi-Fi connection (2.4 GHz and 5 GHz networks) at both close range and through a barrier (10 meters) to confirm full RF transmission and reception capability.

- Open a GPS diagnostic tool (such as GPS Test / AndroiTS GPS) and verify reception of both L1 and L5 satellite signals with lock acquisition within 15 seconds.